Urban

New Jersey American Water –  Haven Ave.

New Jersey American Water – Haven Ave.

Ocean City was undertaking a major sewer infrastructure...

Blue Water Condominium Phase II

Blue Water Condominium Phase II

Phase II of this condo underpinning project addressed...

Horace Mann School

Horace Mann School

A turn of the century public school was...

Island Park Flood Mitigation

Island Park Flood Mitigation

New sewer lines were installed through an active...

Salisbury Water Treatment Plant

Salisbury Water Treatment Plant

This municipality's Water Treatment Plant had been constructed...

Philadelphia Navy Yard Building 57

Philadelphia Navy Yard Building 57

This office building was being converted to commercial...

Route 42 Belmawr Road Tiebacks

Route 42 Belmawr Road Tiebacks

Phase III of Direct Connect, eliminating traffic congestion...

Blue Water Condominium

Blue Water Condominium

The original timber piles were driven to a...

Amanda Moffat Pottery 457 Degraw Street

Amanda Moffat Pottery 457 Degraw Street

The original design for an addition of a...

The Battery

The Battery

The old "Philly Electric" building was being converted...

12th and Girard Avenue Philadelphia PA

12th and Girard Avenue Philadelphia PA

A high rise apartment building in Philadelphia with...

National Institute of Health

National Institute of Health

NIH was adding modular units to increase virus...

Stop & Shop Arverne, NY

Stop & Shop Arverne, NY

Large Diameter Helical Piles with pile caps were...

Bradly House: Bradley Farm Lane

Bradly House: Bradley Farm Lane

An older residential home (without a crawl...

Dilan House: 5314 29th street

Dilan House: 5314 29th street

A new residential home in Washington, DC. was...

NAVFAC – Carnaghi Machine Foundation

NAVFAC – Carnaghi Machine Foundation

Design-build pile foundation for an equipment pad to...

NJ Environmental Remediation Underpinning

NJ Environmental Remediation Underpinning

An underground oil tank was buried in front...

Ridge Avenue Load Test Program

Ridge Avenue Load Test Program

A five story apartment building required a deep...

5th and Berks Helical Pile Installation

5th and Berks Helical Pile Installation

A new three story apartment building was being...

Mixed Use Building 701 Broad Street

Mixed Use Building 701 Broad Street

A seven story mixed use high rise building...

Capital Tent Tie-Down

Capital Tent Tie-Down

In 1980 helical anchors were installed on the...

Augusta Maine Building Retrofit

Augusta Maine Building Retrofit

A building was being retrofitted and repurposed in...

Warehouse Retrofit

Warehouse Retrofit

A former warehouse was being retrofitted to convert...

Boston Museum of Fine Arts World Cup Yacht Display

Boston Museum of Fine Arts World Cup Yacht Display

The museum of Fine Arts in Boston, in...

44th & Ludlow Load Test

44th & Ludlow Load Test

A new five story multi dwelling housing complex...

Breezy Point House Lift

Breezy Point House Lift

A home from hurricane Sandy had to be...

Hoboken Emergency Repair

Hoboken Emergency Repair

A row home in Hoboken was falling apart....

Mill Basin Helical Installation

Mill Basin Helical Installation

Only six helical anchors were needed to repair...

Stelcor Load Test at Septa

Stelcor Load Test at Septa

A new train platform was being constructed for...

3310 20th St. Townhouses

3310 20th St. Townhouses

Urban fill required a deep foundation and helicals...

Poplar Point Duct Bank

Poplar Point Duct Bank

Anchor piles were required to tie-down a duct...

Packer Park 2

Packer Park 2

A developer purchased a school and was renovating...

Brooklyn NY – 146 S. 4th St Load Test

Brooklyn NY – 146 S. 4th St Load Test

A parking garage was under going renovations and...

Rugby Library Load Test

Rugby Library Load Test

An 80 KIP helical pile needed to be...

80-68 59th St Load Test

80-68 59th St Load Test

New York City DOB Regulations required a load...

80-68 59th St. Flushing, NY

80-68 59th St. Flushing, NY

A new home was being constructed in Flushing,...

Manhattan 80 KIP Load Test

Manhattan 80 KIP Load Test

A project in Manhattan with with very restrictive...

256 North 9th Street Helical Installation

256 North 9th Street Helical Installation

30 Helical piles were installed and pile caps...

Newbury Street Production Install

Newbury Street Production Install

An 8" helical pipe pile was originally specified...

256 North 9th Load Test

256 North 9th Load Test

Due to NYC D.O.B regulations, a load test...

124 Withers

124 Withers

A new four-story high rise was being constructed...

20th Street Housing Development

20th Street Housing Development

Ten new homes were being constructed on 20th...

New England Load Test

New England Load Test

WOH blow counts to 40' called for a...

66 East Street Production Install

66 East Street Production Install

Upon the completion of the required load test,...

66 East Street Load Test

66 East Street Load Test

Per NYC D.O.B Specifications for load testing piles,...

G.R.L. Dynamic Load Test

G.R.L. Dynamic Load Test

Project Summary: G.R.L. Engineers conducted a dynamic load test...

Ocean City, Maryland Elevator Shaft

Ocean City, Maryland Elevator Shaft

An elevator was being added to an existing...

DELCORA WWTP

DELCORA WWTP

Electrical Duct Banks were being added to a...

Sage and Lawrence Well Site Piles

Sage and Lawrence Well Site Piles

A steel access railing and stair case were...

1 Nassau Ave

1 Nassau Ave

A new rock climbing facility was being built...

Lancaster Shoring

Lancaster Shoring

An excavation in Lancaster, PA needed shoring. The...

Bensonhurst Load Test

Bensonhurst Load Test

The owner of a home in the Bensonhurst...

Smart Cell Tower Installations

Smart Cell Tower Installations

A telecommunications contractor teamed up with the state...

Wilbur Chocolate Factory

Wilbur Chocolate Factory

Wilbur Chocolates was recently purchased by a developer...

250 Coster Street

250 Coster Street

A produce distributor was looking to add a...

1080 Beacon Street

1080 Beacon Street

A seven story apartment building in Brookline, Massachusetts...

818 Bloomfield Street

818 Bloomfield Street

The contractor recently completed hand-held training with DANBRO...

473 Sackett Street

473 Sackett Street

A deep foundation element was required for an...

21 Clark Street

21 Clark Street

An old hotel was being retrofitted into a...

Federal Reserve Building Washington D.C.

Federal Reserve Building Washington D.C.

The Federal Reserve Building was adding a large...

DHL Building 293

DHL Building 293

DHL was adding a mezzanine level to an...

143 Bay 47th St.

143 Bay 47th St.

Construction of an addition for a residence in...

Poplar Point Manhole/Sewer Piles

Poplar Point Manhole/Sewer Piles

A project in Washington D.C. required a deep...

Lillian Wald Houses

Lillian Wald Houses

Helical piles were chosen as an alternate to...

Building 20 Philadelphia Navy Yard

Building 20 Philadelphia Navy Yard

Helical Piles were installed to support pile caps...

Brooklyn Pulldown Pile

Brooklyn Pulldown Pile

Limited access and mobilization issues drove the decision...

Building 1029 Philadelphia Navy Yard

Building 1029 Philadelphia Navy Yard

Mechanical Equipment slab required a deep foundation due...

Tropicana Pedestrian Connector

Tropicana Pedestrian Connector

STELCOR was selected, rather than Auger Cast piles,...

University of Pennsylvania White Training Center Basement Reconstruction

University of Pennsylvania White Training Center Basement Reconstruction

Replace existing bi-level basement slab and retaining walls...

Taco Bell/KFC

Taco Bell/KFC

Project Summary: A new restaurant required a deep...

Shurs Lane Homes

Shurs Lane Homes

New homes Project Summary: Helical Pile Type: 1.75" Square...

NE WPCP Aeration Line

NE WPCP Aeration Line

A new overhead aeration line was constructed to...

Con Edison Power Plant

Con Edison Power Plant

Helical piles were installed in a tight, confined...

Metro North Catenary & Bridge Replacement

Metro North Catenary & Bridge Replacement

In Connecticut, there are approximately 200 miles of...

Meadowmere Sewer Reconstruction

Meadowmere Sewer Reconstruction

The New York City Department of Design and...

Opal Street Sewer Reconstruction

Opal Street Sewer Reconstruction

Reconstruction of 430 feet of Opal Street in...

SEPTA Highland Avenue

SEPTA Highland Avenue

The Audubon installation team completed this project in...

Korman Suites

Korman Suites

The apartments were built on piles, but the...

Poplar Point Pump Station

Poplar Point Pump Station

A side of a hill needed to be...

Perry World House, University of Pennsylvania

Perry World House, University of Pennsylvania

The Perry World House, a new building on...

1109 Metropolitan Ave

1109 Metropolitan Ave

An existing one-story warehouse with office space in...

Fairfield Plaza Addition

Fairfield Plaza Addition

Due to unsuitable miscellaneous fill soils at the...

Tasker Homes

Tasker Homes

The Philadelphia Housing Authority had a housing community...

American Legion Drive Bulkhead

American Legion Drive Bulkhead

Instead of ripping up street ends to reinstall...

Breezy Point Residence

Breezy Point Residence

On Wednesday, April 27th 2017, the first recorded...

Recycling Center

Recycling Center

Middle Township, NJ commissioned construction of a canopy...

Brooklyn Build it Back (Plum Beach Channel)

Brooklyn Build it Back (Plum Beach Channel)

A house in Brooklyn, NY (Gerritsen Beach), was...

Septa Wayne Junction

Septa Wayne Junction

A retaining wall was installed to prevent soils...

41 West 11th Street, Manhattan

41 West 11th Street, Manhattan

Five Soldier Piles were needed in order to...