American Legion Drive Bulkhead

Category:

Date: 6/8/2007

Duration: 10 Days

Solid square shaft helicals were installed into the existing bulkhead. Then the new composite sheeting was tied to the anchors for a full bulkhead repair.

Project Summary:

  • Helical Pile Type: 1.75” Square Shaft
  • # of Helical Piles: 192
  • Location: Keyport, NJ 08601
  • Installation Depth: 55 feet
  • Equipment Used: Eskridge 12,000 Ft # Drivehead
  • Challenge/Unique Aspect: Working in tidal situations to install piles through the bulkhead
  • Engineer/Architect: Birdsall Engineering
  • General Contractor: Bird Construction