Load Test

Ridge Avenue Load Test Program

Ridge Avenue Load Test Program

A five story apartment building required a deep...

Tavo Packaging

Tavo Packaging

A new printing press imported from Germany required...

Capital Tent Tie-Down

Capital Tent Tie-Down

In 1980 helical anchors were installed on the...

Atlantic City Armory

Atlantic City Armory

The National Guard was replacing and repairing (...

44th & Ludlow Load Test

44th & Ludlow Load Test

A new five story multi dwelling housing complex...

Rugby Library Load Test

Rugby Library Load Test

An 80 KIP helical pile needed to be...

80-68 59th St Load Test

80-68 59th St Load Test

New York City DOB Regulations required a load...

Manhattan 80 KIP Load Test

Manhattan 80 KIP Load Test

A project in Manhattan with with very restrictive...

Newbury Street Production Install

Newbury Street Production Install

An 8" helical pipe pile was originally specified...

256 North 9th Load Test

256 North 9th Load Test

Due to NYC D.O.B regulations, a load test...

2 Chetwynd Rd

2 Chetwynd Rd

A developer in Cambridge Massachusetts was building two...

New England Load Test

New England Load Test

WOH blow counts to 40' called for a...

Tieback Proof and Performance Tests

Tieback Proof and Performance Tests

After installation of the tiebacks, the work site...

66 East Street Load Test

66 East Street Load Test

Per NYC D.O.B Specifications for load testing piles,...

G.R.L. Dynamic Load Test

G.R.L. Dynamic Load Test

A G.R.L. dynamic load test was performed on...

Haddon Heights Load Test 1 Phase I

Haddon Heights Load Test 1 Phase I

An addition to the gymnasium at Haddon Heights...

Haddon Heights High School Load Test 2

Haddon Heights High School Load Test 2

The second phase of the additions to Haddon...

Bensonhurst Load Test

Bensonhurst Load Test

The owner of a home in the Bensonhurst...

GRL Dynamic Load Test on Grouted 2″ Pile

GRL Dynamic Load Test on Grouted 2″ Pile

A new medical facility needed to provide support...

1109 Metropolitan Ave

1109 Metropolitan Ave

An existing one-story warehouse with office space in...

I-295 Tie Back – Phase 1

I-295 Tie Back – Phase 1

Phase 1 of the "Direct Connect" highway improvement...