Category: New Construction
Date: 12/20//2017
Duration: 2 Days
Tags: Bridge, Access, Coastal, Commercial, Compression, Foundation, Limited Access, Marine, Micropile, Mobilization, Municipal, Overhead Access, Pedestrian, Ramp, STELCOR, Support, Urban
STELCOR was selected, rather than Auger Cast piles, due to site (overhead), equipment, and cost considerations. Gencorelli Engineering value-engineered the project for installing contractor A. R. Henry, to minimize site restrictions and control cost.
Project Summary:
- Helical Pile Type: STELCOR
- # of Helical Piles: 12
- Location: Atlantic City, NJ
- Installation Depth: 20′
- Equipment Used: Kamatsu 228 Excavator
- Challenge/Unique Aspect: Access (headroom), mobilization & cost
- Engineer/Architect: Gencorelli Engineering
- Danbro Installer: Arthur R Henry Inc.
- General Contractor: Massett Building Co.