Marsh Discovery Trail Walkway

The Meadowlands Commission was building a walkway through Discovery Trail but needed to minimize disturbance to the sensitive environment.

Project Summary:

  • Helical Pile Type: 1 1/2″ square shaft
  • Location: Lyndhurst, NJ
  • Installation Depth: 30′-35′
  • Ultimate Pile Capacity: 25 Kips
  • Challenge/Unique Aspect: Helicals screw in gently with little to no distrubance to the environment utilizing small low impact equipment which also minmizes access issues.
  • Engineer/Architect: Henry German, Meadowlands Conservation Commission
  • General Contractor: Miura Contracting