Category: New Construction
Date: 02/14/2018
Duration: 4 Days
Tags: Coastal, Foundation, Government, Infrastructure, Municipal, Pad, Slab, Support
The GC, Aliano, Bros., requested value engineering for helicals to reduce labor, accelerate the schedule, speed installation, and mitigate vibration.
Project Summary:
- Helical Pile Type: RS 2 7/8″.203
- # of Helical Piles: 78
- Location: Stone Harbor, NJ
- Installation Depth: 15′ – 17′
- Equipment Used: Kubota mini-excavator
- Challenge/Unique Aspect: Helicals as an alternative to driven wooden piles due to vibration concerns
- Engineer/Architect: Remington Vernick
- General Contractor: Aliano Bros.
- Installer: Audubon Environmental & Helical Piers