Foundation support for two large billboards in extremely poor soil conditions with weight of hammer conditions for an extended length.  Large rocks and boulders were encountered in the first 7′ and a second excavator was used to remove them, while the first machine installed piles.

Project Summary:

  • Helical Pile Type: RS8625.250
  • # of Helical Piles: 27
  • Location: Secaucus, NJ 07032
  • Installation Depth: 150′
  • Equipment Used: Digga 80k
  • Challenge/Unique Aspect: Minimize traffic delays with minimum site disturbance.
  • Installer/General Contractor: McAuliffe Contractors