Guy Wires for Cell Towers

Guy Wires were needed to tie down some cable wires at a cell tower. Helical anchors were determined to be the least invasive, quickest method to do so.

Project Summary:

  • Helical Pile Type: 1.75″ Square Shaft
  • # of Helical Piles: 8
  • Location: Medford, NJ
  • Installation Depth: 35′ – 40′
  • Ultimate Pile Capacity: 80 Kips
  • Equipment Used: Kubota Excavator, 12K Drive, Strain Gauge Torque Indicator
  • Challenge/Unique Aspect: All the helical tiedowns were installed in one day.  The speed of installation allowed for the rest of the required work to begin a week ahead of schedule.
  • Audubon Environmental & Helical Piers